ID: P16-006849
Status: ISSUED
Valuation: $312,313.92
Type: RESIDENTIAL BUILDING
New Single Family
RES : SNEW
Entered: Sep 20, 2016
Issued: Jun 19, 2017
Description: NEW SFR W/ IRR 50 HEADS RECLAIMED
Attachments: Attachments not available for this permit type.

Permit Location

* The locations mapped above are approximate.
** Some addresses were not mapped.

Online Fees and Payment Balance

Fees:$1,008.60
Trust-$1,008.60
Balance:$0.00

Related Permits

Permit Number Balance Due Amount to Pay Add Selected
View in Cart In Cart
**Plan Review Fee
View Cart Add Selected to Cart
* Will include a 2.5% convenience fee.
**The plan review fee is the minimum amount you can pay. It is required for us to get started on your permit request and is already included in the total amount due.

Related Addresses

History

August 2017Inspection: 8 - 15 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ROOF: Roof - Dry-in / Flashing

Inspector: ESTEVENS
Inspection: 8 - 9 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Ext. Sheathing/Strapping

Inspector: LBAR2
Inspection: 8 - 9 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ROOF:Roof Sheathing

Inspector: LBAR2
Inspection: 8 - 4 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Temp Underground (TUG)

Inspector: ESTEVENS
Inspection: 8 - 4 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Temp Underground (TUG)
conf# 049121 Duke
Inspector: LBAR2
Inspection: 8 - 4 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Temp Underground (TUG)
IVRS - Inspection :*
Inspector: LBAR2
July 2017Inspection: 7 - 26 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Lintel / Beam / Down Cel

Inspector: ESTEVENS
7 - 7 - 2017Notice
FORMBOARD APPROVED
7 - 7 - 2017NOTE: Development Review Approval
FORMBOARD APPROVED
Inspection: 7 - 6 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Electrical - Underground

Inspector: PROV1
Inspection: 7 - 5 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Concrete Encased Electro

Inspector: PROV1
Inspection: 7 - 5 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Monolithic Footing/Slab

Inspector: PROV1
June 2017Inspection: 6 - 29 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - PLUM: Plumbing - Underground

Inspector: PSR44M
Inspection: 6 - 29 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - PLUM: Sewer

Inspector: PSR44M
6 - 19 - 2017Comment
Approved permit released for download.
6 - 19 - 2017Comment
NEED UTIL AFF/TUG, RCVD DUKE
6 - 19 - 2017Comment
SERVICEMASTER NEEDS UPDATED STATE LIC
6 - 19 - 2017Notice
FIRST PERMIT APPLICATION EXTENSION APPROVED UNTIL 08/28/17. CHARGED 40.00. SCANNED.
6 - 19 - 2017Payment for: $1008.60
Payment Method: Trust
6 - 16 - 2017Comment
Plans electronically stamped
6 - 15 - 2017Appr: Building Office Approval
P16-006849 B1. Just a reminder, handrail ends shall be returned to the wall or shall terminate in newel posts. FBCR 311.7.8.2 B2. Smoke alarms and smoke detectors shall not be installed within a 36 inch horizontal path from a door to a bathroom containing a shower or tub. NFPA 72 29.8.3.4
6 - 15 - 2017Appr: 911 Communications Approval
6 - 15 - 2017APC: Development Review Approval
DEV REVIEW - FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOTS 53 REUNION WEST PH 3 WEST FFE 128.90 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
6 - 15 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-006849 SFR SETBACKS FRONT= 20FT REAR 20FT SIDES= 5FT CORNER SIDE= 10FT ZONING APPROVED (CZEP) 06/15/2017
6 - 15 - 2017Appr: Environmental Office Approval
6 - 15 - 2017Notice
FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOTS 53 REUNION WEST PH 3 WEST FFE 128.90 FLOOD ZONE "X" DRIVEWAY & SIDEWALK
6 - 14 - 2017Comment
Applicant uploaded documents. Routed for review.
January 20171 - 23 - 201701 : Zoning Office Approval
No Documents submitted to review
November 201611 - 8 - 2016APPR: Impact Fee Approval
September 20169 - 20 - 2016Permit entered on September 20, 2016
9 - 20 - 2016Comment
Application uploaded in Project Dox, (on line application from permitting office) WEB PERMIT - Waiting for uploads
9 - 20 - 2016APPR: Health Dept Approval
9 - 20 - 2016APPR: CCO Health Dept Approval
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BGII: General Inspection/Info
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Building - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Building - Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Condemnation
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Drywall Screw
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Firestopping
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Footings
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Framing
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Insulation
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Light Steel
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Notice of Commencement
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: NPDES Compliance
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Slab on Grade
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Electrical - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Pre Power
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: GAS: Gas - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: HLTH: Drainfield Construction
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: HLTH: Well Approved
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: HLTH:Mound Construction Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Underground
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH - Electrical Service
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH - Mechanical
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH - Sewer / Water
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH Set / Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH Skirting Policy
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: D.W.V.
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Plumbing - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Plumbing - Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Tubset
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Water Service
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Deck
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Piping
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ROOF: Roofing - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: Setback-Side Yard
9 - 19 - 2016Comment
RCVD VIA ONLINE, SENT TO SCANNING
9 - 19 - 2016Notice
NEED NOC ON JOBSITE
September 20169 - 20 - 2016Permit entered on September 20, 2016
July 20177 - 7 - 2017Notice
FORMBOARD APPROVED
June 20176 - 19 - 2017Comment
Approved permit released for download.
6 - 19 - 2017Comment
NEED UTIL AFF/TUG, RCVD DUKE
6 - 19 - 2017Comment
SERVICEMASTER NEEDS UPDATED STATE LIC
6 - 19 - 2017Notice
FIRST PERMIT APPLICATION EXTENSION APPROVED UNTIL 08/28/17. CHARGED 40.00. SCANNED.
6 - 16 - 2017Comment
Plans electronically stamped
6 - 15 - 2017Notice
FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOTS 53 REUNION WEST PH 3 WEST FFE 128.90 FLOOD ZONE "X" DRIVEWAY & SIDEWALK
6 - 14 - 2017Comment
Applicant uploaded documents. Routed for review.
September 20169 - 20 - 2016Comment
Application uploaded in Project Dox, (on line application from permitting office) WEB PERMIT - Waiting for uploads
9 - 19 - 2016Comment
RCVD VIA ONLINE, SENT TO SCANNING
9 - 19 - 2016Notice
NEED NOC ON JOBSITE
June 2017Inspection: 6 - 29 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - PLUM: Plumbing - Underground

Inspector: PSR44M
Inspection: 6 - 29 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - PLUM: Sewer

Inspector: PSR44M
July 2017Inspection: 7 - 5 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Concrete Encased Electro

Inspector: PROV1
Inspection: 7 - 5 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Monolithic Footing/Slab

Inspector: PROV1
Inspection: 7 - 6 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Electrical - Underground

Inspector: PROV1
Inspection: 7 - 26 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Lintel / Beam / Down Cel

Inspector: ESTEVENS
August 2017Inspection: 8 - 4 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Temp Underground (TUG)

Inspector: ESTEVENS
Inspection: 8 - 4 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Temp Underground (TUG)
conf# 049121 Duke
Inspector: LBAR2
Inspection: 8 - 4 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ELEC: Temp Underground (TUG)
IVRS - Inspection :*
Inspector: LBAR2
Inspection: 8 - 9 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - BLDG: Ext. Sheathing/Strapping

Inspector: LBAR2
Inspection: 8 - 9 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ROOF:Roof Sheathing

Inspector: LBAR2
Inspection: 8 - 15 - 2017

Entered On: 9 - 20 - 2016
Inspection: APPR - ROOF: Roof - Dry-in / Flashing

Inspector: ESTEVENS
September 2016Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BGII: General Inspection/Info
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Building - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Building - Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Condemnation
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Drywall Screw
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Firestopping
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Footings
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Framing
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Insulation
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Light Steel
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Notice of Commencement
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: NPDES Compliance
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Slab on Grade
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Electrical - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Pre Power
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: GAS: Gas - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: HLTH: Drainfield Construction
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: HLTH: Well Approved
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: HLTH:Mound Construction Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MECH: Mechanical - Underground
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH - Electrical Service
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH - Mechanical
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH - Sewer / Water
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH Set / Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: MH: MH Skirting Policy
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: D.W.V.
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Plumbing - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Plumbing - Other
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Tubset
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM: Water Service
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Deck
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Piping
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ROOF: Roofing - Final
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 9 - 20 - 2016

Entered On: 9 - 20 - 2016
Pending Inspection: ZONE: Setback-Side Yard
June 20176 - 19 - 2017Payment for: $1008.60
Payment Method: Trust
July 20177 - 7 - 2017NOTE: Development Review Approval
FORMBOARD APPROVED
June 20176 - 15 - 2017Appr: Building Office Approval
P16-006849 B1. Just a reminder, handrail ends shall be returned to the wall or shall terminate in newel posts. FBCR 311.7.8.2 B2. Smoke alarms and smoke detectors shall not be installed within a 36 inch horizontal path from a door to a bathroom containing a shower or tub. NFPA 72 29.8.3.4
6 - 15 - 2017Appr: 911 Communications Approval
6 - 15 - 2017APC: Development Review Approval
DEV REVIEW - FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOTS 53 REUNION WEST PH 3 WEST FFE 128.90 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
6 - 15 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-006849 SFR SETBACKS FRONT= 20FT REAR 20FT SIDES= 5FT CORNER SIDE= 10FT ZONING APPROVED (CZEP) 06/15/2017
6 - 15 - 2017Appr: Environmental Office Approval
January 20171 - 23 - 201701 : Zoning Office Approval
No Documents submitted to review
November 201611 - 8 - 2016APPR: Impact Fee Approval
September 20169 - 20 - 2016APPR: Health Dept Approval
9 - 20 - 2016APPR: CCO Health Dept Approval