ID: P17-002109
Status: ISSUED
Valuation: $518,047.26
Type: RESIDENTIAL BUILDING
New Single Family
RES : SNEW
Entered: Mar 22, 2017
Issued: Jun 19, 2017
Description: NEW SFR P17-002109 B1. Please provide one complete set of Form R405-14 Florida Energy Efficiency Code for Building Construction. The Energy Conservation must be signed and dated, and have the correct street address. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
Attachments: Attachments not available for this permit type.

Permit Location

* The locations mapped above are approximate.
** Some addresses were not mapped.

Online Fees and Payment Balance

Fees:$824.60
Credit Crd-$808.60
Credit Crd-$16.00
Balance:$0.00

Related Permits

Permit Number Balance Due Amount to Pay Add Selected
View in Cart In Cart
**Plan Review Fee
View Cart Add Selected to Cart
* Will include a 2.5% convenience fee.
**The plan review fee is the minimum amount you can pay. It is required for us to get started on your permit request and is already included in the total amount due.

Related Addresses

History

June 20176 - 19 - 2017Comment
Plans stamped and released for download/print.
6 - 16 - 2017Comment
Hold CO for HD 49-SA-1768719
6 - 16 - 2017APPR: Health Dept Approval
May 20175 - 15 - 2017APPR: Impact Fee Approval
April 20174 - 26 - 2017Comment
NEED UTIL AFF/TUG // Utility recvd in ProjectDox.
4 - 26 - 2017Comment
NEED TO LIST SUBS
4 - 25 - 2017Comment
Rev 2- Applicant uploaded energy calcs. (1) Page added to misc fees. Routed for review.
4 - 25 - 2017Payment for: $16.00
Payment Method: Credit Crd
4 - 25 - 201790: Building Office Approval
Rev 2- Energy Calcs
4 - 25 - 2017APPR: Building Office Approval
Changemarks note #01 - P17-002109 B1. Item addressed. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
4 - 17 - 2017Hold: Building Office Approval
P17-002109 B1. Please provide one complete set of Form R405-14 Florida Energy Efficiency Code for Building Construction. The Energy Conservation must be signed and dated, and have the correct street address. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
4 - 17 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-002109 SFR APPROVED SETBACKS-FRONT & REAR=25FT, SIDE=20FT OSCEOLA COUNTY ZONING JMW 4/17/17
4 - 17 - 2017APC: Environmental Office Approval
Approval with Condition. 1. 50 Foot wetland buffer must remain undisturbed, and protected by silt fence throughout construction.
4 - 17 - 201790: Environmental Office Approval
Rev 1- Applicant uploaded revised site plan
4 - 17 - 201790: Zoning Office Approval
Rev 1- Applicant uploaded revised site plan
4 - 17 - 201790: Building Office Approval
Rev 1- Applicant uploaded revised site plan
4 - 6 - 2017Notice
Formboard Survey required prior to slab pour inspection. This property lies partially within the Floodplain - Flood Zone X/A. The structucture is located within Flood Zone "X" Proposed finish floor elevation at 101.0'.
4 - 6 - 2017Payment for: $808.60
Payment Method: Credit Crd
4 - 6 - 2017APC: Development Review Approval
Formboard Survey required prior to slab pour inspection. This property lies partially within the Floodplain - Flood Zone X/A. The structucture is located within Flood Zone "X" Proposed finish floor elevation at 101.0'.
4 - 4 - 2017Hold: Building Office Approval
P17-002109 B1. Please provide one complete set of Form R405-14 Florida Energy Efficiency Code for Building Construction. The Energy Conservation must be signed and dated, and have the correct street address. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
March 20173 - 31 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-002109 SFR APPROVED SETBACKS-FRONT & REAR=25FT, SIDE=20FT OSCEOLA COUNTY ZONING JMW 3/31/17
3 - 31 - 2017Appr: 911 Communications Approval
3 - 31 - 2017Hold: Environmental Office Approval
On Site Plan, show wetland delineation line and callout a 50-foot buffer from the line.
3 - 31 - 2017Comment
routed for review
3 - 24 - 2017Comment
Multi-page plan set was uploaded. Email sent to correct issue.
3 - 22 - 2017Permit entered on March 22, 2017
3 - 22 - 2017Comment
WEB Documents(Permit app) uploaded in Project Dox 03.22.17
3 - 22 - 2017Notice
NEED NOC ON JOBSITE
3 - 22 - 2017Comment
RCVD VIA ONLINE, SENT TO SCANNING
3 - 22 - 2017NOTE: Health Dept Approval
Property on Septic - needs to apply for a NEW system w/site plan to scale, floor plan
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Footings
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Framing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Temp Underground (TUG)
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Underground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: Setback-Side Yard
March 20173 - 22 - 2017Permit entered on March 22, 2017
June 20176 - 19 - 2017Comment
Plans stamped and released for download/print.
6 - 16 - 2017Comment
Hold CO for HD 49-SA-1768719
April 20174 - 26 - 2017Comment
NEED UTIL AFF/TUG // Utility recvd in ProjectDox.
4 - 26 - 2017Comment
NEED TO LIST SUBS
4 - 25 - 2017Comment
Rev 2- Applicant uploaded energy calcs. (1) Page added to misc fees. Routed for review.
4 - 6 - 2017Notice
Formboard Survey required prior to slab pour inspection. This property lies partially within the Floodplain - Flood Zone X/A. The structucture is located within Flood Zone "X" Proposed finish floor elevation at 101.0'.
March 20173 - 31 - 2017Comment
routed for review
3 - 24 - 2017Comment
Multi-page plan set was uploaded. Email sent to correct issue.
3 - 22 - 2017Comment
WEB Documents(Permit app) uploaded in Project Dox 03.22.17
3 - 22 - 2017Notice
NEED NOC ON JOBSITE
3 - 22 - 2017Comment
RCVD VIA ONLINE, SENT TO SCANNING
April 20174 - 25 - 2017Payment for: $16.00
Payment Method: Credit Crd
4 - 6 - 2017Payment for: $808.60
Payment Method: Credit Crd
June 20176 - 16 - 2017APPR: Health Dept Approval
May 20175 - 15 - 2017APPR: Impact Fee Approval
April 20174 - 25 - 201790: Building Office Approval
Rev 2- Energy Calcs
4 - 25 - 2017APPR: Building Office Approval
Changemarks note #01 - P17-002109 B1. Item addressed. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
4 - 17 - 2017Hold: Building Office Approval
P17-002109 B1. Please provide one complete set of Form R405-14 Florida Energy Efficiency Code for Building Construction. The Energy Conservation must be signed and dated, and have the correct street address. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
4 - 17 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-002109 SFR APPROVED SETBACKS-FRONT & REAR=25FT, SIDE=20FT OSCEOLA COUNTY ZONING JMW 4/17/17
4 - 17 - 2017APC: Environmental Office Approval
Approval with Condition. 1. 50 Foot wetland buffer must remain undisturbed, and protected by silt fence throughout construction.
4 - 17 - 201790: Environmental Office Approval
Rev 1- Applicant uploaded revised site plan
4 - 17 - 201790: Zoning Office Approval
Rev 1- Applicant uploaded revised site plan
4 - 17 - 201790: Building Office Approval
Rev 1- Applicant uploaded revised site plan
4 - 6 - 2017APC: Development Review Approval
Formboard Survey required prior to slab pour inspection. This property lies partially within the Floodplain - Flood Zone X/A. The structucture is located within Flood Zone "X" Proposed finish floor elevation at 101.0'.
4 - 4 - 2017Hold: Building Office Approval
P17-002109 B1. Please provide one complete set of Form R405-14 Florida Energy Efficiency Code for Building Construction. The Energy Conservation must be signed and dated, and have the correct street address. B2. Glazing in all fixed and operable panels of swinging, sliding and bifold doors shall be considered a hazardous location. B3. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the floor or walking surface shall be considered a hazardous location. B4. Just a reminder, required Safety- Glazing around wet surfaces. FBC R308.4.5
March 20173 - 31 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-002109 SFR APPROVED SETBACKS-FRONT & REAR=25FT, SIDE=20FT OSCEOLA COUNTY ZONING JMW 3/31/17
3 - 31 - 2017Appr: 911 Communications Approval
3 - 31 - 2017Hold: Environmental Office Approval
On Site Plan, show wetland delineation line and callout a 50-foot buffer from the line.
3 - 22 - 2017NOTE: Health Dept Approval
Property on Septic - needs to apply for a NEW system w/site plan to scale, floor plan
March 2017Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Footings
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Framing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ELEC: Temp Underground (TUG)
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Plumbing - Underground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 3 - 22 - 2017

Entered On: 3 - 31 - 2017
Pending Inspection: ZONE: Setback-Side Yard