Permit Details for P17-002697

Permit Details

View Permit Card Certificate of Occupancy Unavailable Certificate of Completion Unavailable Schedule Inspection View / Cancel Inspections
ID: P17-002697
Status: ISSUED
Valuation: $815,743.44
Type: BLDG: COMMERCIAL PERMIT
New Commercial
COMM : CNEW
Entered: Apr 13, 2017
Issued: Jun 19, 2017
Description: NEW CONSTRUCTION FOUR BAY FIRE STATION 62 BUILDING,
Attachments: Attachments not available for this permit type.

Permit Location

* The locations mapped above are approximate.
** Some addresses were not mapped.

Contacts

contractorWHARTON-SMITH INC

Online Fees and Payment Balance

Fees:$637.31
Credit Crd-$637.31
Balance:$0.00

Related Permits

Permit Number Balance Due Amount to Pay Add Selected
View in Cart In Cart
**Plan Review Fee
View Cart Add Selected to Cart
* Will include a 2.5% convenience fee.
**The plan review fee is the minimum amount you can pay. It is required for us to get started on your permit request and is already included in the total amount due.

Related Addresses

History

August 2017Inspection: 8 - 4 - 2017

Entered On: 4 - 17 - 2017
Inspection: PA - BLDG: Footings

Inspector: LMW47B
July 2017Inspection: 7 - 28 - 2017

Entered On: 4 - 17 - 2017
Inspection: PA - BLDG: Footings
see pink hi-lite
Inspector: LMW47B
7 - 27 - 2017Comment
PAVILION PERMIT P17-004117 / RESTROOM BLDG P17-004118
June 20176 - 19 - 2017Comment
All Fees Have Been Paid, The Status Has Been Automatically Changed to ISSUED (added by script)
6 - 19 - 2017Payment for: $637.31
Payment Method: Credit Crd
6 - 19 - 2017APPR: TOHO Approval
6 - 19 - 2017APPR: Environmental Office Approval
6 - 19 - 2017APPR: Zoning Office Approval
6 - 16 - 2017APPR: Development Review Approval
6 - 7 - 2017APC: Building Office Approval
Comments. B1- answered. B2- answered. B3- Roof truss engineering can be delayed but shall be submitted for review prior to installation of trusses. B4- answered.
6 - 7 - 2017Appr: Electrical Approval
6 - 7 - 2017Comment
Permit stamped & released for download. Still pending approval of SDP17-0036 before this permit can be issued.
6 - 7 - 2017Comment
Added dambrosi to Contractor Field in ProjectDox.
6 - 6 - 2017Comment
Rev 1- Applicant uploaded response to comments. Routed for review.
6 - 6 - 201790: Electrical Approval
Rev 1- applicant uploaded response to comments.
6 - 6 - 201790: Building Office Approval
Rev 1- applicant uploaded response to comments.
6 - 2 - 2017APPR: 911 Communications Approval
May 20175 - 30 - 2017APC: Fire Marshal Approval
Examination of submitted documents for Fire Marshal approval to issue Building Project Permit to construct a Fire Station with Mixed Occupancy Classifications (B, R & S), finds the provided drawing plans and supporting documents within the application package acceptable for APPROVAL WITH CONDITONS as described in the following comments: (F-1) Separate Fire Department Permits shall be obtained from Florida Licensed Fire Protection Contractors who will be contracted to install required fire protection systems and appliances. The following lists the current Codes and Standards for the required systems for this project: a) Automatic Fire Sprinkler System (Aboveground) per "Standard for the Installation of Sprinkler Systems" NFPA 13 (2010 Edition) b) Automatic Fire Sprinkler System (Underground Supply) per "Standard for the Installation of Private Fire Service Mains and Their Appurtenances" NFPA 24 (2010 Edition) c) Monitored Fire Alarm System per NFPA 72®, National Fire Alarm and Signaling Code (2010 Edition), including NFPA 70 (2011) NEC, Article 760 "Fire Alarm Systems" d) Hood Suppression System for Cooking Appliances per "Standard for Wet Chemical Extinguishing Systems" (2009 Edition) & "Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations" NFPA 96 (2011 Edition).
5 - 17 - 2017APPR: Impact Fee Approval
No Impact Fees
April 20174 - 21 - 2017Hold: Development Review Approval
Pending approval of SDP17-0036 and pre-construction meeting.
4 - 18 - 2017Hold: Building Office Approval
P17-002697 B1. FBC 5TH ED 1803.6; Please provide Geotechnical report indicating bearing capacity of soil. B2. Florida Product Approval required for exterior doors, windows and roofing. B3. Please provide signed and sealed roof truss engineering for review prior to installing trusses. B4. A separate permit is required for park pavilion, restroom building, dumpster enclosure and generator enclosure.
4 - 17 - 2017Hold: Zoning Office Approval
PENDING APPROVAL OF SDP17-0036
4 - 17 - 2017Hold: Electrical Approval
Changemarks note #01 - C405.7 Electrical power (Mandatory). C405.7.1 Applicability. This section applies to all building power distribution systems. The provisions for electrical distribution for all sections of this code are subject to the design conditions in ASHRAE Standard 90.1.
4 - 17 - 2017Appr: Plumbing Approval
4 - 17 - 2017Appr: Mechanical Approval
4 - 14 - 2017Hold: 911 Communications Approval
Changemarks note #01 - Parcel ID is incorrect for this Permit. It should be 07-25-30-2675-000A-0050 Resubmit on a Revision Transmittal form with the correct parcel ID to the Permitting Department at permitting@osceola.org
4 - 14 - 2017Hold: Environmental Office Approval
Pending approval of SDP17-0036 and pre-construction meeting.
4 - 14 - 2017Comment
Specs & digitally sealed plans uploaded by applicant. Routed for review.
4 - 13 - 2017Permit entered on April 13, 2017
4 - 13 - 2017Comment
WEB Documents(Permit app) uploaded in Project Dox 04.13.17
4 - 13 - 2017APPR: Health Dept Approval
4 - 13 - 2017HOLD: TOHO Approval
On hold for payment of water and sewer SDC fees and TWA plan acceptance. Please submit hard copies of construction plans to TWA for review and acceptance. Send questions to Ray Biron at rbiron@tohowater.com
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Accessible Route/Parking
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ceiling Grid / Framing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Driveway Grading & Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Footings
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Framing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Miami Curb D/W Pre-Pour
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Threshold
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Structural Concrete Pour
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Tie Down CT/Office Trlrs
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: FIRE: Fire Department Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: FIRE: Plan Review
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: FIRE:Life Safety Insp TCO
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Const. Trailer-Temp Rmvl
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-ROW of Highway
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-Side Yard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Billboard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Flags
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Message Center
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Other
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Pole
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Temp Balloon Rmv
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Temp Banner Rmvl
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Temp Mobile Rmvl
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Wall
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Tent-Temp Removal
April 20174 - 13 - 2017Permit entered on April 13, 2017
July 20177 - 27 - 2017Comment
PAVILION PERMIT P17-004117 / RESTROOM BLDG P17-004118
June 20176 - 19 - 2017Comment
All Fees Have Been Paid, The Status Has Been Automatically Changed to ISSUED (added by script)
6 - 7 - 2017Comment
Permit stamped & released for download. Still pending approval of SDP17-0036 before this permit can be issued.
6 - 7 - 2017Comment
Added dambrosi to Contractor Field in ProjectDox.
6 - 6 - 2017Comment
Rev 1- Applicant uploaded response to comments. Routed for review.
April 20174 - 14 - 2017Comment
Specs & digitally sealed plans uploaded by applicant. Routed for review.
4 - 13 - 2017Comment
WEB Documents(Permit app) uploaded in Project Dox 04.13.17
July 2017Inspection: 7 - 28 - 2017

Entered On: 4 - 17 - 2017
Inspection: PA - BLDG: Footings
see pink hi-lite
Inspector: LMW47B
August 2017Inspection: 8 - 4 - 2017

Entered On: 4 - 17 - 2017
Inspection: PA - BLDG: Footings

Inspector: LMW47B
April 2017Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Accessible Route/Parking
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ceiling Grid / Framing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Driveway Grading & Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Footings
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Framing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Miami Curb D/W Pre-Pour
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Spec Rpt Threshold
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Structural Concrete Pour
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: BLDG: Tie Down CT/Office Trlrs
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: FIRE: Fire Department Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: FIRE: Plan Review
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: FIRE:Life Safety Insp TCO
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Const. Trailer-Temp Rmvl
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-ROW of Highway
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Setback-Side Yard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Billboard
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Flags
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Message Center
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Other
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Pole
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Temp Balloon Rmv
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Temp Banner Rmvl
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Temp Mobile Rmvl
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Signage-Wall
Inspection: 4 - 13 - 2017

Entered On: 4 - 17 - 2017
Pending Inspection: ZONE: Tent-Temp Removal
June 20176 - 19 - 2017Payment for: $637.31
Payment Method: Credit Crd
June 20176 - 19 - 2017APPR: TOHO Approval
6 - 19 - 2017APPR: Environmental Office Approval
6 - 19 - 2017APPR: Zoning Office Approval
6 - 16 - 2017APPR: Development Review Approval
6 - 7 - 2017APC: Building Office Approval
Comments. B1- answered. B2- answered. B3- Roof truss engineering can be delayed but shall be submitted for review prior to installation of trusses. B4- answered.
6 - 7 - 2017Appr: Electrical Approval
6 - 6 - 201790: Electrical Approval
Rev 1- applicant uploaded response to comments.
6 - 6 - 201790: Building Office Approval
Rev 1- applicant uploaded response to comments.
6 - 2 - 2017APPR: 911 Communications Approval
May 20175 - 30 - 2017APC: Fire Marshal Approval
Examination of submitted documents for Fire Marshal approval to issue Building Project Permit to construct a Fire Station with Mixed Occupancy Classifications (B, R & S), finds the provided drawing plans and supporting documents within the application package acceptable for APPROVAL WITH CONDITONS as described in the following comments: (F-1) Separate Fire Department Permits shall be obtained from Florida Licensed Fire Protection Contractors who will be contracted to install required fire protection systems and appliances. The following lists the current Codes and Standards for the required systems for this project: a) Automatic Fire Sprinkler System (Aboveground) per "Standard for the Installation of Sprinkler Systems" NFPA 13 (2010 Edition) b) Automatic Fire Sprinkler System (Underground Supply) per "Standard for the Installation of Private Fire Service Mains and Their Appurtenances" NFPA 24 (2010 Edition) c) Monitored Fire Alarm System per NFPA 72®, National Fire Alarm and Signaling Code (2010 Edition), including NFPA 70 (2011) NEC, Article 760 "Fire Alarm Systems" d) Hood Suppression System for Cooking Appliances per "Standard for Wet Chemical Extinguishing Systems" (2009 Edition) & "Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations" NFPA 96 (2011 Edition).
5 - 17 - 2017APPR: Impact Fee Approval
No Impact Fees
April 20174 - 21 - 2017Hold: Development Review Approval
Pending approval of SDP17-0036 and pre-construction meeting.
4 - 18 - 2017Hold: Building Office Approval
P17-002697 B1. FBC 5TH ED 1803.6; Please provide Geotechnical report indicating bearing capacity of soil. B2. Florida Product Approval required for exterior doors, windows and roofing. B3. Please provide signed and sealed roof truss engineering for review prior to installing trusses. B4. A separate permit is required for park pavilion, restroom building, dumpster enclosure and generator enclosure.
4 - 17 - 2017Hold: Zoning Office Approval
PENDING APPROVAL OF SDP17-0036
4 - 17 - 2017Hold: Electrical Approval
Changemarks note #01 - C405.7 Electrical power (Mandatory). C405.7.1 Applicability. This section applies to all building power distribution systems. The provisions for electrical distribution for all sections of this code are subject to the design conditions in ASHRAE Standard 90.1.
4 - 17 - 2017Appr: Plumbing Approval
4 - 17 - 2017Appr: Mechanical Approval
4 - 14 - 2017Hold: 911 Communications Approval
Changemarks note #01 - Parcel ID is incorrect for this Permit. It should be 07-25-30-2675-000A-0050 Resubmit on a Revision Transmittal form with the correct parcel ID to the Permitting Department at permitting@osceola.org
4 - 14 - 2017Hold: Environmental Office Approval
Pending approval of SDP17-0036 and pre-construction meeting.
4 - 13 - 2017APPR: Health Dept Approval
4 - 13 - 2017HOLD: TOHO Approval
On hold for payment of water and sewer SDC fees and TWA plan acceptance. Please submit hard copies of construction plans to TWA for review and acceptance. Send questions to Ray Biron at rbiron@tohowater.com