Permit Details for P17-003722

Permit Details

View Permit Card Certificate of Occupancy Unavailable Certificate of Completion Unavailable Schedule Inspection View / Cancel Inspections
ID: P17-003722
Status: ISSUED
Valuation: $5,000.00
Type: RESIDENTIAL BUILDING
Mobile Home
RES : MHOM
Entered: May 16, 2017
Issued: Jun 19, 2017
Description: INSTALL REPLACEMENT PARK MODEL. CONNECT WATER AND SEWER TO EXISTING SERVICE CONNECT AC UNIT
Attachments: Attachments not available for this permit type.

Permit Location

* The locations mapped above are approximate.
** Some addresses were not mapped.

Online Fees and Payment Balance

Fees:$336.60
Credit Crd-$312.60
Balance:$24.00
Payments Locked

Related Permits

Permit Number Balance Due Amount to Pay Add Selected
View in Cart In Cart
**Plan Review Fee
View Cart Add Selected to Cart
* Will include a 2.5% convenience fee.
**The plan review fee is the minimum amount you can pay. It is required for us to get started on your permit request and is already included in the total amount due.

Related Addresses

509 - 509 ARCHER LN
Parcel: 102528000000100000
Total Addresses: 1
334 - 340 BIRCH ST
Parcel: 102528000000100000
Total Addresses: 7
301 - 307 CHESTNUT ST
Parcel: 102528000000100000
Total Addresses: 7
1 - 1 CLUBHOUSE DR
Parcel: 102528000000100000
Total Addresses: 1
315 - 321 DOGWOOD ST
Parcel: 102528000000100000
Total Addresses: 7
145 - 179 DURHAM CIR
Parcel: 102528000000100000
Total Addresses: 33
43 - 53 FINCASTLE CT
Parcel: 102528000000100000
Total Addresses: 11
308 - 314 HEMLOCK ST
Parcel: 102528000000100000
Total Addresses: 7
322 - 326 HICKORY ST
Parcel: 102528000000100000
Total Addresses: 5
5 - 27 IVANHOE CT
Parcel: 102528000000100000
Total Addresses: 23
327 - 333 LOCUST ST
Parcel: 102528000000100000
Total Addresses: 7
341 - 347 MAPLE ST
Parcel: 102528000000100000
Total Addresses: 7
11 - 18 MERRY MEN DR
Parcel: 102528000000100000
Total Addresses: 8
1 - 2 SHERWOOD DR
Parcel: 102528000000100000
Total Addresses: 2
355 - 361 SPRUCE ST
Parcel: 102528000000100000
Total Addresses: 7
348 - 354 WALNUT ST
Parcel: 102528000000100000
Total Addresses: 7
242 - 248 WINDSOR CT
Parcel: 102528000000100000
Total Addresses: 7

History

August 20178 - 16 - 2017Lock
MH HOME HAS POPWER BEFORE INSPECTION HAS BEEN APPROVED
8 - 16 - 2017Notice
PER BOB DEATHERAGE PULL POWER/NO INSPECTIONS HAVE BEEN APPROVED
Inspection: 8 - 15 - 2017

Entered On: 5 - 18 - 2017
Inspection: NC - MH: MH Set / Final
Ground rods not visible for inspection. Multiple layers of PT wood used on top of peirs. Manufacture's instructions show first two piers under the house, beyond the porch, being a maximum of 4' back. Power no home in violation of Installers Affidavit
Inspector: SWW53S
8 - 15 - 2017APPR: RCO Health Dept Approval
June 20176 - 16 - 2017Comment
NEED TO LIST ELECTRICIAN
6 - 13 - 2017Comment
Approved permit released for download.
May 20175 - 25 - 2017Payment for: $312.60
Payment Method: Credit Crd
5 - 25 - 2017APPR: Impact Fee Approval
Replacement mobile home; no impact fees due
5 - 23 - 2017Comment
Plans electronically stamped
5 - 22 - 2017Appr: Building Office Approval
5 - 19 - 2017APC: Development Review Approval
FLOOD ZONE "X" APPROVED
5 - 18 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-003722 REPLACEMENT PARK MODEL SETBACK 10 FT BETWEEN STRUCTURES ZONING APPROVED (CZEP) 05/18/2017
5 - 18 - 2017Appr: 911 Communications Approval
5 - 18 - 2017Comment
Documents uploaded by applicant. Project sent for review.
5 - 16 - 2017Permit entered on May 16, 2017
5 - 16 - 2017Comment
WEB Documents(Permit app) uploaded in Project Dox 05.16.17
5 - 16 - 2017Comment
WEB APP, SENT TO SCANNING
5 - 16 - 2017Notice
NEED NOC ON JOBSITE
5 - 16 - 2017APPR: Health Dept Approval
5 - 16 - 2017Pending Approval: RCO Building Dept Approval
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Footings
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Framing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Temp Underground (TUG)
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Underground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: Setback-Side Yard
May 20175 - 16 - 2017Permit entered on May 16, 2017
August 20178 - 16 - 2017Lock
MH HOME HAS POPWER BEFORE INSPECTION HAS BEEN APPROVED
8 - 16 - 2017Notice
PER BOB DEATHERAGE PULL POWER/NO INSPECTIONS HAVE BEEN APPROVED
June 20176 - 16 - 2017Comment
NEED TO LIST ELECTRICIAN
6 - 13 - 2017Comment
Approved permit released for download.
May 20175 - 23 - 2017Comment
Plans electronically stamped
5 - 18 - 2017Comment
Documents uploaded by applicant. Project sent for review.
5 - 16 - 2017Comment
WEB Documents(Permit app) uploaded in Project Dox 05.16.17
5 - 16 - 2017Comment
WEB APP, SENT TO SCANNING
5 - 16 - 2017Notice
NEED NOC ON JOBSITE
August 2017Inspection: 8 - 15 - 2017

Entered On: 5 - 18 - 2017
Inspection: NC - MH: MH Set / Final
Ground rods not visible for inspection. Multiple layers of PT wood used on top of peirs. Manufacture's instructions show first two piers under the house, beyond the porch, being a maximum of 4' back. Power no home in violation of Installers Affidavit
Inspector: SWW53S
May 2017Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Footings
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Framing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ELEC: Temp Underground (TUG)
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Plumbing - Underground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 5 - 16 - 2017

Entered On: 5 - 18 - 2017
Pending Inspection: ZONE: Setback-Side Yard
May 20175 - 25 - 2017Payment for: $312.60
Payment Method: Credit Crd
August 20178 - 15 - 2017APPR: RCO Health Dept Approval
May 20175 - 25 - 2017APPR: Impact Fee Approval
Replacement mobile home; no impact fees due
5 - 22 - 2017Appr: Building Office Approval
5 - 19 - 2017APC: Development Review Approval
FLOOD ZONE "X" APPROVED
5 - 18 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-003722 REPLACEMENT PARK MODEL SETBACK 10 FT BETWEEN STRUCTURES ZONING APPROVED (CZEP) 05/18/2017
5 - 18 - 2017Appr: 911 Communications Approval
5 - 16 - 2017APPR: Health Dept Approval
5 - 16 - 2017Pending Approval: RCO Building Dept Approval