Permit Details for P17-004144

Permit Details

View Permit Card Certificate of Occupancy Unavailable Certificate of Completion Unavailable Schedule Inspection View / Cancel Inspections
ID: P17-004144
Status: ISSUED
Valuation: $203,055.87
Type: RESIDENTIAL BUILDING
New Single Family
RES : SNEW
Entered: May 30, 2017
Issued: Jun 19, 2017
Description: SINGLE FAMILY RES WITH 14 HEAD IRR - RECLAIMED
Attachments: Attachments not available for this permit type.

Permit Location

* The locations mapped above are approximate.
** Some addresses were not mapped.

Online Fees and Payment Balance

Fees:$1,028.20
Trust-$60.00
Check-$952.20
Balance:$16.00
Pay Fees Now

Related Permits

Permit Number Balance Due Amount to Pay Add Selected
View in Cart In Cart
**Plan Review Fee
View Cart Add Selected to Cart
* Will include a 2.5% convenience fee.
**The plan review fee is the minimum amount you can pay. It is required for us to get started on your permit request and is already included in the total amount due.

Related Addresses

History

August 20178 - 14 - 2017Appr: Building Office Approval
Inspection: 8 - 14 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Ext.Wall Dry-in/Flashing

Inspector: JBUSALACHI
8 - 14 - 2017Comment
RAI 01 Documents uploaded in Project Dox, and routed for review 08.14.17
8 - 14 - 2017Comment
RAI 01 electronically stamped & released for download.
8 - 14 - 201790: Building Office Approval
RAI 01 revised energy calcs
8 - 11 - 2017Comment
RAI 01 recvd in Doc Management. Placed in rack to be scanned.
Inspection: 8 - 10 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ROOF: Roof - Dry-in / Flashing

Inspector: SWW53S
8 - 10 - 2017Comment
RCVD REV SENT TO SCANNING
Inspection: 8 - 7 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Ext. Sheathing/Strapping

Inspector: SWW53S
Inspection: 8 - 7 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ROOF:Roof Sheathing

Inspector: SWW53S
Inspection: 8 - 2 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ELEC: Temp Underground (TUG)

Inspector: jbus
Inspection: 8 - 2 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ELEC: Temp Underground (TUG)
PRIVATE PROVIDER - JOE BUSALACCHI
Inspector: JBUSALCHI
8 - 2 - 2017Comment
FAX TO DUKE ENERGY/TUG 10:50
July 2017Inspection: 7 - 24 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Lintel / Beam / Down Cel

Inspector: SWW53S
7 - 21 - 2017APPR: RCO Health Dept Approval
Inspection: 7 - 11 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Concrete Encased Electro

Inspector: SWW53S
Inspection: 7 - 11 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Monolithic Footing/Slab

Inspector: SWW53S
Inspection: 7 - 7 - 2017

Entered On: 6 - 1 - 2017
Inspection: NC - BLDG: Monolithic Footing/Slab
FBC110 Must call in 1001 concrete encased electrode inspection with monolithic slab inspection. .inspection incomplete
Inspector: LBAR2
June 2017Inspection: 6 - 29 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - PLUM: Plumbing - Underground

Inspector: LBAR2
6 - 28 - 2017Notice
Formboard Approved
6 - 28 - 2017APPR: Development Review Approval
Formboard Approved
6 - 19 - 2017Comment
Approved permit released for download.
6 - 13 - 2017Payment for: $952.20
Payment Method: Check
6 - 7 - 2017APPR: Impact Fee Approval
6 - 1 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-004144 SFR APPROVED SETBACKS-FRONT=20FT, REAR=10FT, SIDE=5FT, SIDE STREET=15FT OSCEOLA COUNTY ZONING JMW 6/1/17
6 - 1 - 2017APC: Development Review Approval
DEV REV APPR - Formboard Survey required prior to slab pour inspection LOT 108 ESTATE C –FFE=74.96 FLOODZONE X DRIVEWAY & SIDEWALK
6 - 1 - 2017Appr: Building Office Approval
P17-004144 B1. Smoke alarms and smoke detectors shall not be installed within a 36 inch horizontal path from a door to a bathroom containing a shower or tub. NFPA 72 29.8.3.4 B2. For tray-shaped ceilings, smoke alarms and smoke detectors shall be installed on the highest portion of the ceiling or on the sloped portion of the ceiling within 12 inches vertically down from the highest point. NFPA 72 29.8.3.4
6 - 1 - 2017Appr: 911 Communications Approval
6 - 1 - 2017Appr: Environmental Office Approval
6 - 1 - 2017Comment
DOCUMENTS UPLOADED TO PROJECT DOX. ROUTED FOR REVIEW. HARD COPIES WILL BE DESTROYED ON THE MORNING OF 6-8-17
6 - 1 - 2017Notice
Formboard Survey required prior to slab pour inspection LOT 108 ESTATE C -FFE=74.96 FLOODZONE X DRIVEWAY & SIDEWALK
6 - 1 - 2017Comment
Project stamped for approval
May 20175 - 31 - 2017APPR: Health Dept Approval
5 - 30 - 2017Permit entered on May 30, 2017
5 - 30 - 2017Comment
RECFV UTILITY - TUG - DUKE
5 - 30 - 2017Comment
NEED NOC ON JOB SITE
5 - 30 - 2017Notice
HUERTAS, EFRAIN - NEED INS
5 - 30 - 2017Comment
Documents received in document management for scanning.
5 - 30 - 2017Payment for: $60.00
Payment Method: Trust
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Footings
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Framing
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: Setback-Side Yard
May 20175 - 30 - 2017Permit entered on May 30, 2017
August 20178 - 14 - 2017Comment
RAI 01 Documents uploaded in Project Dox, and routed for review 08.14.17
8 - 14 - 2017Comment
RAI 01 electronically stamped & released for download.
8 - 11 - 2017Comment
RAI 01 recvd in Doc Management. Placed in rack to be scanned.
8 - 10 - 2017Comment
RCVD REV SENT TO SCANNING
8 - 2 - 2017Comment
FAX TO DUKE ENERGY/TUG 10:50
June 20176 - 28 - 2017Notice
Formboard Approved
6 - 19 - 2017Comment
Approved permit released for download.
6 - 1 - 2017Comment
DOCUMENTS UPLOADED TO PROJECT DOX. ROUTED FOR REVIEW. HARD COPIES WILL BE DESTROYED ON THE MORNING OF 6-8-17
6 - 1 - 2017Notice
Formboard Survey required prior to slab pour inspection LOT 108 ESTATE C -FFE=74.96 FLOODZONE X DRIVEWAY & SIDEWALK
6 - 1 - 2017Comment
Project stamped for approval
May 20175 - 30 - 2017Comment
RECFV UTILITY - TUG - DUKE
5 - 30 - 2017Comment
NEED NOC ON JOB SITE
5 - 30 - 2017Notice
HUERTAS, EFRAIN - NEED INS
5 - 30 - 2017Comment
Documents received in document management for scanning.
June 2017Inspection: 6 - 29 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - PLUM: Plumbing - Underground

Inspector: LBAR2
July 2017Inspection: 7 - 7 - 2017

Entered On: 6 - 1 - 2017
Inspection: NC - BLDG: Monolithic Footing/Slab
FBC110 Must call in 1001 concrete encased electrode inspection with monolithic slab inspection. .inspection incomplete
Inspector: LBAR2
Inspection: 7 - 11 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Concrete Encased Electro

Inspector: SWW53S
Inspection: 7 - 11 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Monolithic Footing/Slab

Inspector: SWW53S
Inspection: 7 - 24 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Lintel / Beam / Down Cel

Inspector: SWW53S
August 2017Inspection: 8 - 2 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ELEC: Temp Underground (TUG)

Inspector: jbus
Inspection: 8 - 2 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ELEC: Temp Underground (TUG)
PRIVATE PROVIDER - JOE BUSALACCHI
Inspector: JBUSALCHI
Inspection: 8 - 7 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Ext. Sheathing/Strapping

Inspector: SWW53S
Inspection: 8 - 7 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ROOF:Roof Sheathing

Inspector: SWW53S
Inspection: 8 - 10 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - ROOF: Roof - Dry-in / Flashing

Inspector: SWW53S
Inspection: 8 - 14 - 2017

Entered On: 6 - 1 - 2017
Inspection: APPR - BLDG: Ext.Wall Dry-in/Flashing

Inspector: JBUSALACHI
May 2017Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Footings
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Framing
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 5 - 30 - 2017

Entered On: 6 - 1 - 2017
Pending Inspection: ZONE: Setback-Side Yard
June 20176 - 13 - 2017Payment for: $952.20
Payment Method: Check
May 20175 - 30 - 2017Payment for: $60.00
Payment Method: Trust
August 20178 - 14 - 2017Appr: Building Office Approval
8 - 14 - 201790: Building Office Approval
RAI 01 revised energy calcs
July 20177 - 21 - 2017APPR: RCO Health Dept Approval
June 20176 - 28 - 2017APPR: Development Review Approval
Formboard Approved
6 - 7 - 2017APPR: Impact Fee Approval
6 - 1 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-004144 SFR APPROVED SETBACKS-FRONT=20FT, REAR=10FT, SIDE=5FT, SIDE STREET=15FT OSCEOLA COUNTY ZONING JMW 6/1/17
6 - 1 - 2017APC: Development Review Approval
DEV REV APPR - Formboard Survey required prior to slab pour inspection LOT 108 ESTATE C –FFE=74.96 FLOODZONE X DRIVEWAY & SIDEWALK
6 - 1 - 2017Appr: Building Office Approval
P17-004144 B1. Smoke alarms and smoke detectors shall not be installed within a 36 inch horizontal path from a door to a bathroom containing a shower or tub. NFPA 72 29.8.3.4 B2. For tray-shaped ceilings, smoke alarms and smoke detectors shall be installed on the highest portion of the ceiling or on the sloped portion of the ceiling within 12 inches vertically down from the highest point. NFPA 72 29.8.3.4
6 - 1 - 2017Appr: 911 Communications Approval
6 - 1 - 2017Appr: Environmental Office Approval
May 20175 - 31 - 2017APPR: Health Dept Approval