Permit Details for P17-004548

Permit Details

View Permit Card Certificate of Occupancy Unavailable Certificate of Completion Unavailable Schedule Inspection View / Cancel Inspections
ID: P17-004548
Status: ISSUED
Valuation: $193,296.06
Type: RESIDENTIAL BUILDING
Model Home
RES : MODEL
Entered: Jun 13, 2017
Issued: Jun 19, 2017
Description: 7/18/17 from SFR to model home. SINGLE FAMILY RES WITH 40 HEAD IRR - RECLAIMED
Attachments: Attachments not available for this permit type.

Permit Location

* The locations mapped above are approximate.
** Some addresses were not mapped.

Online Fees and Payment Balance

Fees:$1,346.80
Check-$80.00
Credit Crd-$932.20
Credit Crd-$334.60
Re-Dist OP-$334.60
Balance:$0.00

Related Permits

Permit Number Balance Due Amount to Pay Add Selected
View in Cart In Cart
**Plan Review Fee
View Cart Add Selected to Cart
* Will include a 2.5% convenience fee.
**The plan review fee is the minimum amount you can pay. It is required for us to get started on your permit request and is already included in the total amount due.

Related Addresses

History

August 20178 - 11 - 2017APPR: RCO Impact Fee Approval
assessed when converted to SFR
July 20177 - 20 - 2017Payment for: $334.60
Payment Method: Credit Crd
7 - 20 - 2017Payment for: $334.60
Payment Method: Re-Dist OP
7 - 19 - 2017Comment
RAI 01 electronically stamped & released for download.
7 - 18 - 2017Appr: Building Office Approval
7 - 18 - 2017APC: Development Review Approval
DEV REVIEW - FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
7 - 18 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-004548 SFR APPROVED SETBACKS FRONT GARAGE MIN=21FT, MAX=25FT HOUSE MIN=5FT MAX=25FT REAR=5FT, SIDES=5FT STREET SIDE=MIN=5FT MAX=25FT OSCEOLA COUNTY ZONING 07/18/17 CZEP
7 - 18 - 2017Comment
Rai 01 Documents uploaded in Project Dox, and routed for review 07.18.17
7 - 18 - 2017Notice
FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE "X" DRIVEWAY & SIDEWALK
7 - 18 - 2017Comment
Permit application was modified permit plus from SFR to Model home
7 - 17 - 2017Comment
RAI 01 new set of everything received in Doc Management. In line to be scanned. (25) sheets added to Misc Fees.
7 - 17 - 201790: Zoning Office Approval
RAI 01: Revised everything (plans + site + trusses + energy calcs + prod appr) submitted.
7 - 17 - 201790: Building Office Approval
RAI 01: Revised everything (plans + site + trusses + energy calcs + prod appr) submitted.
7 - 17 - 201790: Development Review Approval
RAI 01: Revised everything (plans + site + trusses + energy calcs + prod appr) submitted.
7 - 14 - 2017Comment
7-14-17 RECV REVISION CHANGE HOUSE PLAN / MODEL SENT TO SCANNING
June 20176 - 19 - 2017Comment
Permissions changed to download/print.
6 - 19 - 2017APPR: Impact Fee Approval
6 - 16 - 2017Payment for: $932.20
Payment Method: Credit Crd
6 - 15 - 2017Appr: Building Office Approval
P17-004548 B1. Just a reminder, handrail ends shall be returned to the wall or shall terminate in newel posts. FBCR 311.7.8.2
6 - 15 - 2017Comment
Plans electronically stamped
6 - 14 - 2017APC: Development Review Approval
DEV REVIEW - FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
6 - 14 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-004548 SFR APPROVED SETBACKS FRONT GARAGE MIN=21FT, MAX=25FT HOUSE MIN=5FT MAX=25FT REAR=5FT, SIDES=5FT STREET SIDE=MIN=5FT MAX=25FT OSCEOLA COUNTY ZONING 06/14/17 CZEP
6 - 14 - 2017Appr: 911 Communications Approval
6 - 14 - 2017Appr: Environmental Office Approval
6 - 14 - 2017Comment
Documents uploaded to ProjectDox & routed for review. Hard copies will be destroyed morning of 6/21.
6 - 14 - 2017Notice
FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
6 - 13 - 2017Permit entered on June 13, 2017
6 - 13 - 2017Comment
Documents received in document management for scanning.
6 - 13 - 2017Payment for: $80.00
Payment Method: Check
6 - 13 - 2017APPR: Health Dept Approval
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Footings
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Framing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Temp Underground (TUG)
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Underground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: Setback-Side Yard
6 - 12 - 2017Comment
RECV UTILITY - TUG - KUA
6 - 12 - 2017Comment
NEED NOC ON JOB SITE
6 - 12 - 2017Comment
SENT TO SCANNING
June 20176 - 13 - 2017Permit entered on June 13, 2017
July 20177 - 19 - 2017Comment
RAI 01 electronically stamped & released for download.
7 - 18 - 2017Comment
Rai 01 Documents uploaded in Project Dox, and routed for review 07.18.17
7 - 18 - 2017Notice
FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE "X" DRIVEWAY & SIDEWALK
7 - 18 - 2017Comment
Permit application was modified permit plus from SFR to Model home
7 - 17 - 2017Comment
RAI 01 new set of everything received in Doc Management. In line to be scanned. (25) sheets added to Misc Fees.
7 - 14 - 2017Comment
7-14-17 RECV REVISION CHANGE HOUSE PLAN / MODEL SENT TO SCANNING
June 20176 - 19 - 2017Comment
Permissions changed to download/print.
6 - 15 - 2017Comment
Plans electronically stamped
6 - 14 - 2017Comment
Documents uploaded to ProjectDox & routed for review. Hard copies will be destroyed morning of 6/21.
6 - 14 - 2017Notice
FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
6 - 13 - 2017Comment
Documents received in document management for scanning.
6 - 12 - 2017Comment
RECV UTILITY - TUG - KUA
6 - 12 - 2017Comment
NEED NOC ON JOB SITE
6 - 12 - 2017Comment
SENT TO SCANNING
July 20177 - 20 - 2017Payment for: $334.60
Payment Method: Credit Crd
7 - 20 - 2017Payment for: $334.60
Payment Method: Re-Dist OP
June 20176 - 16 - 2017Payment for: $932.20
Payment Method: Credit Crd
6 - 13 - 2017Payment for: $80.00
Payment Method: Check
August 20178 - 11 - 2017APPR: RCO Impact Fee Approval
assessed when converted to SFR
July 20177 - 18 - 2017Appr: Building Office Approval
7 - 18 - 2017APC: Development Review Approval
DEV REVIEW - FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
7 - 18 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-004548 SFR APPROVED SETBACKS FRONT GARAGE MIN=21FT, MAX=25FT HOUSE MIN=5FT MAX=25FT REAR=5FT, SIDES=5FT STREET SIDE=MIN=5FT MAX=25FT OSCEOLA COUNTY ZONING 07/18/17 CZEP
7 - 17 - 201790: Zoning Office Approval
RAI 01: Revised everything (plans + site + trusses + energy calcs + prod appr) submitted.
7 - 17 - 201790: Building Office Approval
RAI 01: Revised everything (plans + site + trusses + energy calcs + prod appr) submitted.
7 - 17 - 201790: Development Review Approval
RAI 01: Revised everything (plans + site + trusses + energy calcs + prod appr) submitted.
June 20176 - 19 - 2017APPR: Impact Fee Approval
6 - 15 - 2017Appr: Building Office Approval
P17-004548 B1. Just a reminder, handrail ends shall be returned to the wall or shall terminate in newel posts. FBCR 311.7.8.2
6 - 14 - 2017APC: Development Review Approval
DEV REVIEW - FORMBOARD SURVEY REQUIRED PRIOR TO SLAB POUR INSPECTION. LOT 265 KINDRED PH 1C FFE 67.40 FLOOD ZONE “X” DRIVEWAY & SIDEWALK
6 - 14 - 2017Appr: Zoning Office Approval
ZONING APPR - P17-004548 SFR APPROVED SETBACKS FRONT GARAGE MIN=21FT, MAX=25FT HOUSE MIN=5FT MAX=25FT REAR=5FT, SIDES=5FT STREET SIDE=MIN=5FT MAX=25FT OSCEOLA COUNTY ZONING 06/14/17 CZEP
6 - 14 - 2017Appr: 911 Communications Approval
6 - 14 - 2017Appr: Environmental Office Approval
6 - 13 - 2017APPR: Health Dept Approval
June 2017Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BGII: General Inspection/Info
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Building - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Building - Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Concrete Encased Electro
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Condemnation
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Drywall Screw
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Ext. Lath & Brick Tie
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Ext. Sheathing/Strapping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Ext.Wall Dry-in/Flashing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Firestopping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Footings
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Framing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Framing & Rough-Ins
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Insulation
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Light Steel
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Lintel / Beam / Down Cel
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Monolithic Footing/Slab
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Notice of Commencement
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: NPDES Compliance
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Slab on Grade
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Concrete
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Soil
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Spec Rpt Struct Steel
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: BLDG: Termite Report / Cert.
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: DRYWALL: Drywall - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical - Rough-in
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical - Underground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Electrical Svc Upgrade
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Pre Power
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Temp Constr Power T-Pole
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ELEC: Temp Underground (TUG)
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: GAS: Gas - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: GAS: Gas - Test / Rough-In
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: GAS: Gas-Tanks/Buried Piping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: HLTH: Drainfield Construction
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: HLTH: Well Approved
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: HLTH:Mound Construction Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Duct / Exhaust / Hood
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Fire / Smoke Damper
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Rough-in
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MECH: Mechanical - Underground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH - Electrical Service
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH - Mechanical
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH - Sewer / Water
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH Set / Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: MH: MH Skirting Policy
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: D.W.V.
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Other
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Rough-in
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Plumbing - Underground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Sewer
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Tubset
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM: Water Service
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: PLUM:Backflow/Cross Connection
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Alarm/Barrier
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Deck
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Piping
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: POOL: Pool - Steel and Ground
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ROOF: Roof - Dry-in / Flashing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ROOF: Roofing - Final
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ROOF:Roof Sheathing
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: MH-Temp by BOA Removal
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: Setback-Front Yard
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: Setback-Rear Yard
Inspection: 6 - 13 - 2017

Entered On: 6 - 14 - 2017
Pending Inspection: ZONE: Setback-Side Yard